Full Process ISO Quality Control


From mold flow analysis to mold trials, we carefully plan and execute every step of mold making
Mold Process Quality Control


The mold processing center strictly controls the processing according to the drawings and assembled only after the three-dimensional measurement.
Factory SOP process control


The factory strictly implements SOP for process operation, customer orders, and engineering acceptance standards to ensure customer satisfaction.
Main Inspection Equipments


  • Coordinate measuring machine
  • 2.5-dimensional detector
  • Two-dimensional detector
  • Weight gauge
  • Roughness tester
  • Micrometer
  • Caliper
  • Block gauge
  • Film thickness tester
  • colorimeter
  • Glossmeter
  • Salt mist tester
Main Inspection Equipments


Type
Physical Dimension
Material Testing
Trustworthiness
Surface Finish Testing
Management
Euipment Operation Training
GR&R
Maintenance And Use
Instrument Calibration
Statistic Analysis
Continuous Improvement
Certificate


Natinal High-Tech Enterprise Certificate

Natinal High-Tech Enterprise Certificate

ISO9001

ISO9001

ISO14001

ISO14001

Verified Supplier Certificate By TUV

Verified Supplier Certificate By TUV

Verified Supplier Certificate By TUV 1

Verified Supplier Certificate By TUV 1

Testing Instruments

Testing Instruments

Testing Instruments 2

Testing Instruments 2